Projects

Recent Projects

Shell Vito (FPU)

Year 2019 – Present

Shipyard: Sembcorp Marine Integrated Yard Pte Ltd

This turnkey project for Accommodation was awarded in 2018, the design and material is based on US standard, and all material including flooring, wall and ceiling panel, door shall be constructed in compliance with USCG standard.

Heerema Sleipnir - Warehouse Shelving

Year 2018 – 2019

Shipyard: Jurong Shipyard Pte Ltd

To custom design and supply install for various type of heavy duty shelving, storage cabinet, drawer system, tool board, workbench etc in the warehouse and workshop of world’s largest heavy lift crane vessel.

Heerema Sleipnir - Wamara

Year 2018 – 2019

Shipyard: Jurong Shipyard Pte Ltd

Crawler crane deck timber (WAMARA timber, one of the world hardest and heaviest timber, around 200 tons of Wamara wood imported from South America)

Heerema Sleipnir - Insulation

Year 2018 – 2019

Shipyard: Jurong Shipyard Pte Ltd

Insulation in machinery area. Total area around 220,000 sq ft

Helix Q7000

Year 2016 – 2017

Shipyard: Jurong Shipyard Pte Ltd

To design, supply and install all the furniture, which made by FR material, in accommodation. Wooden pullman bunk, and cabinet with various internal cubicle were tailor made according to client’s special request.

Ghana TEN FPSO

Year 2014 – 2016

Shipyard: Jurong Shipyard Pte Ltd

The turnkey project was awarded in 2014, and delivered in 1Q 2016. The original living quarter was demolished and expanded to 120 MOB, with newly design mess room, recreation room, gym room etc.

We Provide The Best Service In Industry

Other Project Reference

Year Shipyard Project Workscope
2011 Jurong Shipyard Pte Ltd BP Angola Turnkey project for Accommodation
2012 Jurong Shipyard Pte Ltd JSL Dry dock Renewal of Dry dock gate timber 1,2,3,4
2013 Jurong Shipyard Pte Ltd 11-1105 West linus Insulation in machinery area; FRP grating
2014 Jurong Shipyard Pte Ltd Dru 7 (FSO) Steel furniture & soft furnishing for Accommdation
2014 Sembcorp Marine Integrated yard Pte Ltd SMIY Phase 1 dry dock Timber for dock and keel block
2014 Jurong Shipyard Pte Ltd 11-1112 West Rigel Raised floor
2014 Jurong Shipyard Pte Ltd 11-1110 Safe Boreas Insulation, FRP grating and deck timbers
2015 Jurong Shipyard Pte Ltd 11-1113 Prosafe Insulation, FRP grating and deck timbers
2015 Jurong Shipyard Pte Ltd Dru 1 (FSO) Steel furniture & soft furnishing for Accommdation
2017 Jurong Shipyard Pte Ltd EJA Floating dry dock Insulation and Accommodation
2017 Jurong Shipyard Pte Ltd Elite Prosperity Accommodation furniture and refurbish